As part of the Main Street Waterline Replacement project, the Contractor must connect the new waterline to the existing waterlines serving the side streets. For several side streets, this will require closing Main Street (VT Route 15) to all traffic during the work. The work involving the road closures to all traffic will be performed at night from October 30-November 1, 2023, and November 5, with the road closures starting at 8:00 p.m. and the road opened to a minimum of one-way traffic by 6:00 a.m. the following morning. The Contractor will provide message board signs, road closed signs, and detour signs for this closure. For questions concerning this closure, please contact mainstreetwaterline@dlhce.com.